Lines Matching refs:these
38 periods, but where these idle periods are also quite short (tens or
39 hundreds of microseconds). For these types of workloads, scheduling
41 will frequently be multiple runnable tasks per CPU. In these cases,
76 unnecessary scheduling-clock interrupts. In these situations, there
116 by one less than the number of CPUs. In these situations, there is
192 a timer will awaken these CPUs every four jiffies in order to ensure
263 options for these workloads:
299 tasks, even though these interrupts are unnecessary.
306 Better handling of these sorts of situations is future work.
325 result in these shootdowns. For another example, page faults
347 or so. On-going work will eliminate the need even for these