Lines Matching refs:utilization
150 The utilization of a real-time task is defined as the ratio between its
154 If the total utilization U=sum(WCET_i/P_i) is larger than M (with M equal
157 Note that total utilization is defined as the sum of the utilizations
161 Moreover, if the total utilization is larger than M, then we risk starving
163 If, instead, the total utilization is smaller than M, then non real-time
174 utilization[12].
183 of all the tasks executing on a CPU if and only if the total utilization
201 but this cannot be done by comparing the total utilization or density with
235 time t + e + P, after its absolute deadline. The total utilization of the
244 between total utilization (or density) and a fixed constant. If all tasks
254 As seen, enforcing that the total utilization is smaller than M does not
257 a total utilization smaller than M is enough to guarantee that non real-time
262 the total utilization is smaller or equal than M then the response times of
345 correctly schedule a set of real-time tasks is that the total utilization
348 than M. Notice that the ratio runtime/period is equivalent to the utilization
369 interface we can put a cap on total utilization of -deadline tasks (i.e.,