Lines Matching refs:smaller
83 then, if the scheduling deadline is smaller than the current time, or
163 If, instead, the total utilization is smaller than M, then non real-time
170 maximum tardiness of each task is smaller or equal than
184 of the tasks running on such a CPU is smaller or equal than 1.
188 running on such a CPU is smaller or equal than 1:
205 such a time with the interval size t. If h(t) is smaller than t (that is,
207 smaller than the size of the interval) for all the possible values of t, then
230 period smaller than the one of the first task. Hence, if all the tasks
233 smaller than the absolute deadline of Task_1, which is t + P). As a
254 As seen, enforcing that the total utilization is smaller than M does not
257 a total utilization smaller than M is enough to guarantee that non real-time
262 the total utilization is smaller or equal than M then the response times of
346 is smaller than M. When talking about -deadline tasks, this requires that
347 the sum of the ratio between runtime and period for all tasks is smaller
432 -deadline tasks cannot have an affinity mask smaller that the entire