Lines Matching refs:tasks
19 3-2. No internal tasks
183 3-2. No internal tasks
186 tasks belonging to the parent cgroup and its children cgroups. This
191 The cpu controller considers tasks and cgroups as equivalents and maps
194 and the number of internal tasks fluctuates - the ratios constantly
198 available for tasks.
201 cgroup to host the tasks. The hidden leaf has its own copies of all
203 over internal tasks, it's with serious drawbacks. It always adds an
208 happens between internal tasks and child cgroups and the behavior is
214 Multiple controllers struggle with internal tasks and came up with
230 enabled, tasks are always only on the leaves. This rules out
231 situations where child cgroups compete against internal tasks of the
235 the restriction. Root contains tasks and anonymous resource
244 cgroup must create children and transfer all its tasks to the children
294 On traditional hierarchies, if a task has write access to "tasks" or
329 any tasks or child cgroups. Events for internal nodes trigger only
340 subhierarchy has tasks in it or not. Its value is 0 if there is no
363 - The "tasks" file is removed. Everything should at process
453 tasks, leaf weights are meaningless. The operation model is